top of page

The first step is to go through all the
● Drawings
● Specs
● Sheet notes
● Details
● Submittals
to get understanding what should be built and how.


Along with this we go through the construction schedule to prepare a drawing log for Client approval to make sure we are on the same page of what should be delivered and when:
Which conduit we could put underground or inslab for installation cost reduction,
how we could combine circuits in conduits and many others.
Thoughtful Design Review
bottom of page